subscribesubscriber servicescontact usabout ussite mapBuy a Classified
Sat, Nov 07 2009 
Breaking News:  District 10 Scoreboard — Week 10  November 06, 2009 09:12 pm

Resources

print this story   Print this story
  Post to del.icio.us

Published July 02, 2009 10:00 am - Weather permitting, the permanent on-ramp from Meadville to Interstate 79 north is scheduled to open to traffic today.

New I-79 on-ramps open Thursday



Meadville Tribune

Weather permitting, the permanent on-ramp from Meadville to Interstate 79 north is scheduled to open to traffic today. According to Pennsylvania Department of Transportation, which announced the opening of the ramp Wednesday, motorists entering the newly-opened ramp are urged to slow down since work adjacent to the ramp will continue.

And a noted local streetscape artist is well on her way to making the I-79 interchange more eye-appealing.

Once the permanent northbound on-ramp is opened today, the contractor will start excavation, subbase and drainage operations in the passing lane. Excavation and subbase work also continues on the new ramp from Conneaut Lake to I-79 north.

All southbound on and off ramps will remain open as other work in the interchange continues.

The contractor is forming and placing concrete in the new bridge abutments on I-79 North. The existing concrete box culvert below Routes 6, 19 and 322 in the interchange area is being extended.

On the I-79 northbound lanes south of the interchange, the contractor is preparing to pave the passing lane.

Two northbound detours remain in effect. Detour for I-79 North to State Route 6 West: Take State Route 285 West at Exit 141 to State Route 19 North to Route 6 West.

Detour for State Route 6 East to I-79 North: Take State Route 98 North to State Route198 East to I-79 Exit 154.

For additional information, visit the Web site for the I-79 Meadville Interchange Projects: www.i79meadville.com/

Adding an artistic touch

PennDOT has partnered with Allegheny College to create an “Eco-Art” project that merges Earth art with Best Management Practices in the environmental mitigation of stormwater runoff in the ramp infield areas at the interchange.

Amara Geffen, an Allegheny College professor of art who also heads the college’s Center for Economic and Environmental Development, led the team in providing the designs. She is known for several local streetscape projects that include “flowers” and stylized scenes made from retired road signs, around at the PennDOT maintenance facility in Vernon Township (for which she won a state award); and large mural artwork placed in several sites in the City of Meadville.

Joseph B. Fay Co. from Russelton is the contractor constructing the environmental mitigation, which includes sculptural check dams, infiltration pools and earth mounds.

The check dams are being constructed of crushed concrete from the demolished bridges. The dams will reduce the concentrated stormwater flows and protect vegetation. 



print this story    email this story   
Click here to load this Caspio Bridge DataPage.
Click here to load this Caspio Bridge DataPage.






autoconx
Premier Guide
Find a business

Walking Fingers
Maps, Menus, Store hours, Coupons, and more...
Premier Guide
Premier Guide
Premium Jobs

CNC Mill Programmer/Operator for Talbar
Immediate openings for 2nd or 3rd shift. Experienced
CNC Mill Programmer/Operator
with a minimum of 15 year
...>MORE

Auto Body Tech for Authentic Automotives
Auto Body Tech
Exp a must, own tools preferred. Apply in person 290 Pine St, Meadville 8 am-5 pm M-F
...>MORE

Instructor for Practical Nursing Education Program for Mercer County Career Center
instructor for Practical Nursing Education Program. Full-time position. Candidate must be a graduate of an approved...>MORE

Director of Activities/Voluneers for Wesbury U.M. Community
Director of
Activities/
Volunteers
Long Term Care Facility looking for a certified or PA licen
...>MORE

PT Personal Care Attendant
PART-TIME Personal Care Attendant needed in MeadvilleCall 814-573-1167...>MORE

See all ads

Premium Photos

See all ads

Premium Real Estate

Cochranton 3BR house for rent
Cochranton: clean, comfy 3BR $500 incl. some util. 425-8284 anytime 425-8257 after 8PM...>MORE

Conneaut Lake 2BR apt.
Conn. LAKE Newly remodeled 2BR 1st flr., appl. No pets $575 incl. all util Ref + Sec. 814-382-7468...>MORE

2BR home in Vernon
Vernon: 2 BR avail. now $450+util+sec. No pets, Full basement (814)336-3140 bet. 7:30a-4:30p M-F or 332-5065 anytime...>MORE

CONN. LAKE Newly remodeled 2BR 1st flr
conn. LAKE Newly remodeled 2BR 1st flr., appl. No pets $575 incl. all util Ref + Sec. 814-382-7468...>MORE

See all ads

Premium Promos: Check It Out!

See all ads


 

Community Newspaper Holdings, Inc.CNHI Classified Advertising NetworkCNHI News Service
Associated Press content © 2009. All rights reserved. AP content may not be published, broadcast, rewritten or redistributed.
Our site is powered by Zope and our Internet Yellow Pages site is powered by PremierGuide.
Some parts of our site may require you to download the Flash Player Plugin.
View our Privacy Policy
Advertiser index